
Listing Stills And Film
Aerial stills of the house, lot, and block; curb context; and optional listing film. The Hainesport packet is the sample — house, pool, neighborhood from altitude, plus a curb still of the same property.


FAA Part 107 Remote Pilot · Newark, New Jersey
From Rooftops to Bottom Lines.
Aerial photographs, films, and site maps for property and project teams across North Jersey. Tell us the site and the decision you need to make. We plan the capture and deliver a clear, organized set your team can use.
Explore the North Munn bridge documentation, Hainesport listing media, and Kuzuri Kijiji mapping packet.
01
Brief
We collect the mission goal, the site, and the window from you first. A listing still, a month-over-month jobsite set, a claim file, a roof packet, and an orthomosaic are five different flights. Where and when matter as much as what.
02
Authorize
Airspace class, LAANC on the live UAS Facility Map, Part 107 Waivers, TFR and National Security Event notices, and local permits (NYPD for New York City operations, property/GC access, venue clearance). Coordination happens here — not on the pad.
03
Conditions
Day-of weather, TFRs, National Security Events, and NOTAMs can change an approval that looked clean the night before. This is the GO / NO-GO gate. Authorization is planning status, not a launch.
04
Fly
Capture from the viewpoints the brief and the authorization actually allow — stills, film, or a mapping grid. The aircraft comes down when the coverage for the deliverable is in the card, not when the battery is empty.
05
Process
After the flight: cull, color, align, and reconstruct. Photogrammetry, 3D site models, construction tracking sets, and inspection packets are built here. The deliverable is prepared for the client’s review workflow.
06
Deliver
Stills, film, orthomosaics, DEMs, 3D models, progress comparisons, and reports — organized to the specification in the brief. This is the product the client files, presents, or sells. Flying is only half the job.
Field film · flown for work
A planned nadir hold over NJDOT’s North Munn Avenue Bridge replacement over I-280, and a daylight promotional flyover of Embark apartments and the new ShopRite at The Crossings. Select a film to play it.
North Munn Avenue Bridge over I-280 · East Orange · Jun 2026 · 7.5 s nadir hold
Open the packet →Embark + ShopRite at The Crossings · daylight promotional flyover · BAM-EO-CROSSINGS-202606
Open the case study →Preflight — Brief, Authorize, Conditions
Altitude Changes Everything — after the goal, the site, and the window are on the brief, and after Airspace Class, LAANC, Part 107 Waivers, SGI Waivers, TFRs, National Security Events, and local permits line up. Open a stage. The 3D study uses a dated FAA UAS Facility Map snapshot around Newark Liberty. Current restrictions and an actual authorization still determine the flight.
LAANC, 107, TFR, local
In participating Class B, C, D, and surface E, LAANC is how a Part 107 operator requests altitude through an FAA-approved UAS Service Supplier. The grid is in 50-foot steps. A 0 ft cell requires further FAA review for any positive-altitude operation; the grid itself never grants permission to fly. We also read TFRs, National Security Event notices and bulletins, and whether coordination is possible. Local authorizations sit on this layer too: NYPD permit for New York City operations, property or GC access, Port Authority property, parks, and venue clearance.
NYPD Permit
New York City adds a local permit on top of Part 107. Commercial operations in the five boroughs are planned against NYPD requirements, not just the FAA grid. A LAANC over the Hudson does not replace that permit.
Property And GC Access
The remote pilot still needs a place to stand, a visual line of sight, and the owner or general contractor’s clearance. A listing on a occupied street and an empty warehouse roof are different access problems.
Port Authority / Airport Property
Work on or immediately adjacent to PANYNJ facilities (EWR, TEB, LGA, JFK, PATH, ports) is coordinated as airport/property access, not as a LAANC cell alone.
Parks, Venues, Stadiums
Municipal parks, campuses, and event venues often require organizer or agency clearance. A stadium TFR or National Security Event bulletin can close the air even when the park permit is in hand.
A LAANC approval, Part 107 Waiver, or SGI Waivers is planning status — not a contract and not a launch. The 3D chart is a teaching schematic of how Class B, Class D, and UAS Facility Map cells stack around EWR; operational altitudes come from the current FAA map at briefing. Trust + Safety →
Field timeline · elected capture
Browse the views and deliverables from each assignment. Select a frame to explore the site, then open its case study for the complete packet.
Residential · BAM-BANCROFT-LISTING
Aerial views of the house, pool, lot and neighborhood, paired with a street-level photograph of the property.

Hainesport house, swimming pool, lawn and neighboring properties from above
Process + Deliver — the product the client files
From Rooftops to Bottom Lines. After the aircraft is down, frames are culled, aligned, reconstructed, and packed to the specification in the brief. 3D site models and construction tracking live here — not as decoration, as the reason the flight was planned.

3D Site Models
Separate the orthomosaic, elevation visualization and capture coverage. Each answers a different question about the same site. Explore the layers in three dimensions, or isolate an output to examine the source image.
Open the Kuzuri Kijiji case study


Construction Tracking
A 7.5-second nadir hold over NJDOT’s $20.3 million North Munn Avenue Bridge replacement over I-280 — steel, orange barrier, live interstate lanes — alongside daylight aerial stills of The Crossings: Embark apartments at Brick Church station and the new ShopRite. Same geography, two deliverables: the reconstruction, and the redevelopment it sits in. Scheduled through spring 2028.
Open the I-280 bridge packet
Aerial stills of the house, lot, and block; curb context; and optional listing film. The Hainesport packet is the sample — house, pool, neighborhood from altitude, plus a curb still of the same property.

The same viewpoints, visit after visit, so steel, staging, and haul roads are comparable. North Munn Avenue Bridge over I-280 from the air; The Crossings at Brick Church Station — Embark apartments and the new ShopRite — from Freeway Drive at North Munn. Stakeholders can read the site without walking the mud.

Overlapping capture processed into an orthomosaic, elevation visualization, and a 3D site model where included in the scope. Visual mapping for geometry and progress — not a certified survey unless the written scope says otherwise.

Elevated views of structures, surfaces and surroundings, organized for qualified visual review.
From Rooftops to Bottom Lines
A timestamped nadir of a roof, a lot, and the neighboring structures — without putting an adjuster on a wet or steep surface. Visible-condition context for the file, not a cause determination.
Lot lines, the pool, the street, and last light in one still. Ground photography cannot show how a property sits in its block. Altitude can.
The same viewpoint, visit after visit, so staging, steel, and haul roads are comparable. A GC and a lender can read the site without walking it.
Array layout, shading from neighboring trees, and access — organized for the crew that will actually go on the roof. Not an engineering stamp.
Capabilities

Altitude Changes Everything
The Mission Planner maps your objective to a workflow. The brief captures site, timing, constraints, and outputs. Then we review LAANC, Part 107 Waivers, SGI Waivers, and whether the shot is actually flyable.
Altitude Changes Everything
Tell us the site and the decision the media has to support. We will scope the flight, the deliverables, and whether it is operationally feasible under Part 107.
Plan a Drone Mission